Live stream preview

Watch this video and more on Typhoon Legacy Co. Ltd.

Watch this video and more on Typhoon Legacy Co. Ltd.

Subscribe Learn more

Already subscribed? Sign in

Napier Sabre Disassembly II

Season 5 • 14m

Up Next in Season 5

  • Napier Sabre Disassembly

    The much anticipated start of the Sabre aspect of our project has finally taken physical form! We've started with work to disassemble the Mk VII so that we can investigate exactly what we are dealing with as far as usable components. Stay tuned for more exciting updates as this aspect of the proj...

  • Napier Sabre Engine Mounts

    The Typhoon suffered from vibration problems early in it's service life; part of the problem was the direct mounting of the engine to the main spar of the aircraft. As one of the steps taken to reduce vibration, the original solid steel engine mounts were replaced with flexible units. In this epi...

  • S05E03 Frustrations!

    Showcasing one issue results in several failures, with persistence it all worked out.

6 Comments